Sunday, February 22, 2015

Roofs are done and village taking shape


      The warehouse is done. Just finished the roofs and it's weathering. All that's left to do is some touch ups here and there.
     Here's a look at the village. I've realized that I'm missing two houses. I've just ordered them with a few winter figurines. I will be putting lights in every house in strategic places so that not the entire house is lit.

Sunday, February 15, 2015

The little town as started growing

     First, here's a little staging of my box car yard. The next step will be the weathering and finishing the roofs.
     I did a plan of what my little village would look like. There will be 7 houses, a church and a gazebo surrounded by a skating rink. In case I didn't mention it, this part of the layout will be the winter season.
     Here are a few of the houses that will be install in the village. Roofs to be done later.
     The village as started to take shape. The road as been laid out and the location of the houses drawn out.