Saturday, November 28, 2015

A bit more work done

     Manage to do a bit in the last 3 days. I've got about 20% of the frame work done and about to run out of 1x4, should be getting some next week. The peninsula you see, still needs to be secured to the rest of the layout, than I will be starting on the long peninsula. This layout is so much better than my first try, I have lots of accessibility everywhere on the layout, there's no place I can't access.

      To diversify my work, I'll be working on buildings (in a box) and bridges (from scratch), will post when I get started


Here's a video of what's been done so far.
 

Later

Sunday, November 22, 2015

It's been a while, but I'm back

      Went on vacation and came back with a man's cold which lasted a bit more than a week, therefore another delay. BUT, now that all the walls have been painted, wood is in, work as now began on the new layout. I'm only 52 days of my supposedly starting date, but things should be on a roll now.

      Little things left to do, but nothing urgent. Still need to put molding along the ceiling edge and my wife will still use her space till till April/May, besides, I have lots to do before reaching her area.

Here's 3 pictures to get you started.




     This is the area I will be concentrating to start with. I know I should be starting with the first level (staging level), but since it's at the other end and includes my wife's office, it can wait.


 Later