Saturday, October 29, 2016

Already a month from my last update, I guess I'm due.



     Not to much as been done in the last month as I didn't touch the layout before going on vacation, then I was on vacation for 2 weeks and when I got back, I didn't know where to start, but I did get one good week of work.

First, here's a picture of our vacation in Mexico

 
Picture 1 - Now here's what I've been up to in the last week. I finally hooked up the yard to the rest of the layout. 


Picture 2 - I decided on having a gorge  with two trestle bridge to be build later, once I find all the necessary plans and info to build it.


Picture 3 - The storage tracks for the coop is also completed.

 
Picture 4 - The top track splits once the train as gone over the bridge. The main line is in the middle and the top track is the feeder for the future brewery. The bottom track is the second main line. At the bottom, it will be the machine shop.

 
Picture 5 - One of the main line splits for the tunnel towards Montreal (staging area)


What's coming next?
- I need to work on the base of the brewery so that I can do the track work.
- Finally moving my wife's office upstairs.
- Start on the last phase of the layout.
- More buildings to start working on.
- Track wiring, LED strip wiring and more wiring.
- Start installing tortoises.

This should take me till December 2017.....lol.... just kidding
Later