Not to much as been done in the last month as I didn't touch
the layout before going on vacation, then I was on vacation for 2 weeks and
when I got back, I didn't know where to start, but I did get one good week of
work.
First, here's a picture of our vacation in Mexico
Picture 1 - Now here's what I've been up to in the last week.
I finally hooked up the yard to the rest of the layout.
Picture 2 - I decided on having a gorge with two trestle bridge to be build later,
once I find all the necessary plans and info to build it.
Picture 3 - The storage tracks for the coop is also
completed.
Picture 4 - The top track splits once the train as gone over
the bridge. The main line is in the middle and the top track is the feeder for
the future brewery. The bottom track is the second main line. At the bottom, it
will be the machine shop.
Picture 5 - One of the main line splits for the tunnel
towards Montreal
(staging area)
What's coming next?
- I need to work on the base of the brewery so that I can do
the track work.
- Finally moving my wife's office upstairs.
- Start on the last phase of the layout.
- More buildings to start working on.
- Track wiring, LED strip wiring and more wiring.
- Start installing tortoises.
This should take me till December 2017.....lol.... just
kidding
Later