Another update:
I thought I was pretty much advance in my layout just by the looks of what has been done so far, but I then looked at the amount of track done versus total and found out that I only had 16% done. (146' of 920').
- Finished elevation work and track laying up to the refineries.
- Did some photoshop for my backdrop.
- Tested some RGB LED lights.
- Installed some overhangs to test the lights.
- And made this little video of my update
I thought I was pretty much advance in my layout just by the looks of what has been done so far, but I then looked at the amount of track done versus total and found out that I only had 16% done. (146' of 920').
- Finished elevation work and track laying up to the refineries.
- Did some photoshop for my backdrop.
- Tested some RGB LED lights.
- Installed some overhangs to test the lights.
- And made this little video of my update
Later
No comments:
Post a Comment