Latest update:
Been sick ....you know..... a man's cold, but the last few days, I've been hard at work. I don't have much to show, been testing a few things such as a backdrop and some wiring of tortoises.
I have a color printer and thought "hey maybe I could do my own
backdrop", I'm pretty at ease with Photoshop, why not give it a try. I
did look up Backdropjunction and for what I would need, it would cost me
about $2,700 (about 170 feet). As for painting, I can draw straight
lines only...lol. Here's a look.
You all know that I'm a big "zero" when it comes to electricity or
electronics, well, I'm no longer a zero, but maybe a 10 (that's out of
100). I manage to hook up two tortoises together with one switch and it
works fine. I've been having no success with my tortoises last year
because the wire wasn't stiff enough to move the turnout, so I did a bit
of research and read that I should remove the spring in the turnout. I
did that for both turnouts and voila, it works. Can someone confirm that
I did right by removing the spring, because without a tortoise, that
turnout is no longer good.
I've also been working on my other bridge, a trestle bridge which is
almost done and trying to come up with some sort of design for my
river/falls under those two bridges.
Lastly, I'm working on finishing the video on how I build my covered
bridge. I had to condense a 6 hour video into 45 minutes and now I just
need to narrate the whole thing, so maybe another 2-3 weeks before I'm
done with it.
It just seems that I did lots, but don't have much to show. Hoping to have more done on the layout by my next update.
Thanks for following, later.