Sunday, January 17, 2016

Container yard is done and so is the covered bridge

Weekend update

     Finished laying the tracks from the lift-out to the small town. All elevation work now has track. In the following weeks I'll be working on new elevation from the town to the small refinery (includes peninsula), preparing all the feeders for the track that have been installed. 




     Also finished weathering the covered bridge and assembling the track base to the bridge. It is removable so that I can do the landscaping much much later. 


Later all and thanks for dropping by

P.S. The How to of my covered bridge is almost done. I manage to condense 6 hours of video into 30 minutes. The only thing left is adding voice to the video, which should be done this week.